Our Projects

Home > Projects

2000 – Present CELCOM AXIATA BHD ( WITH DAILYCOM SDN BHD)

Installation, testing and commissioning of microwave link for Ericssion, NEC, DMC, Alcatel, Huawei, SM , Nokia and etc.
Installaltion , testing and commissioning of Alcatel, Ericsson and Nokia Siemens NODE B equipments. Reference: Syed Taha B. Syed Mansur, Technical Manager Celcom Axiata Berhad

2008 – Present (SIAE MICROELETTRONICA ( UNDER DAILYCOM SDN BHD)

Site survey and frequency scanning for Celcom transmission network. Site survey and frequency scanning for Digi transmission Project. Installation, dismantle, testing and commissioning of SM microwave for Celcom Transmission network. Reference: Safaron Ibrahim, Project Manager Siae Microelettonica (Malaysia)

2008 * Present (SAPURA RESEARCH SDN BHD) ( WITH DAILYCOM SDN BHD)GIRN PROJECT

Installation, testing and commissioning of microwave link (Nokia Siemens Equipt. Swap BS to SBC system Reference: Mohd. Fuad B. Musa, Senior Manager Network Build and Implementation Sapura Secured Technologies

2008 – 2012 ERICSSON SUDAN ( WITH DAILYCOM SDN BHD)

Survey, Installation, Testing and commissioning of MDRS for ZAIN Project in Sudan Survey, Installation, testing and commissioning of MLTN IP RUN for ZAIN.. Swap, testing and commissioning of RBS 2000, RBS 3000 TO RBS 6000 series. Installation, testing and commissioning of 2G, 3G, LTE complete with antenna for Modernization Project. Upgrading of MDRS for ZAIN Project. Installation of power system PBC 5200 and PBS 6200. E-Site installation for ZAIN BTS Site. Reference: Mohamed Bushara BSc Pmp, Customer Project Manager ERICSSON AB Branch in Sudan

2004 – 2012 (ERICSSON MALAYSIA) ( WITH DAILYCOM SDN BHD)

Survey, Installation, testing and commissioning of MLHC for Telekom Malaysia Survey, Installation, testing and commisioning of MLE for Celcom. Survey, Installation, testing and commissioning of RBS 2000 and 3000 for Celcom. Survey, Installation, testing and commisioning of MLTN for DiGi. Survey, Installation , testing and commisioning of MRDS for Digi. Ericsson DiGi swap Project. MOAT project RBS 6201 for Celcom, Eastern, Sabah and Sarawal region. Reference: Hj. Mustafa B. Haji Mohamad, ASP Training and Competence Dev. Manager ERICSSON (M) SDN BHD (Malaysia)

2012 – Present (Nokia Siemens Network) ( WITH DAILYCOM SDN BHD)

Celcom KVRM Project Installation, testing and commissioing of FLEXI 2G/3G equipment. Reference: Mohamad Yazid B. Mohamad, Project Manager Network Build and Implementation NOKIA SIEMENS NETWORKS SDN BHD

Our Projects

asb